Customization: | Available |
---|---|
Certification: | CE, ISO13485 |
Scale: | Medium |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Requirements | Notes | ||
Installation Space |
Equipment Room |
CT+Pan (Option) |
Not Less Than: 1600mm(L)*2000mm(D)*2400mm(H); Door of Room:Not less than 660mm |
|
CT+Pan+Ceph |
Not Less Than: 2500mm(L)*2100mm(D)*2400mm(H); Door of Room:Not less than 660mm |
|||
Workstation Room |
Not Less Than: 1500mm(L)*1000mm(W)*2500mm(H); | |||
Door Open To | Outside of Room | |||
Floors | Notes to the Floor Number | |||
Mounted On | Solid and Levelling | Floor or Wall | ||
Floor Load | > 250 kg |
Radioprotection |
Equipment Room |
Sulfate Cement Mortar =80mm Concrete) |
Please follow and confirm with the local radioprotection regulations or rules. |
Workstation (PC) Room |
NA |
||
Power Requirements |
Equipment Room |
|
|
Workstation Room | The same requirements with the Equipment Room | ||
Safety |
Equipment Room |
Power-on Indicator(24V),Exposure Indicator(24V), Interlock,Emergency Stop Interlock Interface |
|
Inter-connections |
Equipment room To Workstation room |
Φ50 mm hole in the wall is necessary for the wiring. |
Three pieces 10-Meter Network Cables |
Network Requirement |
Basic |
|
Additional Client PCs if need |
Extended PCs |
win7(SP1 & above)operation system with the discrete Graphics Card(Option) |
||
Operation Environments |
Equipment Room |
Temperatures: 10~40ºC Humidity:≤75% Atmospheric Pressure: 760~1060hPa |
|
Other Special Demand |
Record and Asses the request from the Customers. |